Site start
Housing site start — Ballyhea
Ballyhea, Cork
2 commencement notices · latest start date 14 Mar 2024 · planning reference given
Planning 23/4132 · Planning application
- Commencement notices
- 2
- Latest start date
- 14 Mar 2024
- Latest notice
- 181 m²
- Planning reference
- 23/4132
- Location
- Ballyhea, Cork
Location
Where the site is
- Area
- Ballyhea, Cork
- County
- Cork
- Notice source points are up to 2.0 km apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 52.327056, -8.672773 Open point
- Public notice source · 52.311246, -8.687295 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of dwelling house.
Floor area stated for this source: 181 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
Construction of detached domestic garage
Floor area stated for this source: 64 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.