Site start

Housing site start — Ballymote

Ballymote, Sligo

1 commencement notice · start date 29 May 2024 · planning reference given

Planning 2360225 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
29 May 2024
Latest notice
8,610 m²
Planning reference
2360225
Location
Ballymote, Sligo

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning 2360225 — CONDITIONAL · Decision 2023-10-24 · Final grant 2023-11-27

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Ballymote, Sligo
County
Sligo
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Sligo County Council planning record Application details, status and decision record for 2360225. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The demolition of a 2 no. existing single storey semi- detached dwellings ( & ) to allow for (2) the construction of 10 no. single- storey semi- detached two- bedroom dwellings, together with the construction of a new vehicular junction onto the local road, a pedestrian walkway onto the same local road, on-site storm water attenuation, connection to the public existing sewer systems, works to the site boundaries and all associated site development works including lighting and hard and soft landscaping

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 8,610 m².

Source unit value with scope not stated: 10 houses. It is not presented as notice-specific scale.

Planning reference 2360225 Developer stated: Siara Developments

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.