Site start

Housing site start — Kildare

Kildare, Kildare

1 commencement notice · start date 01 Sep 2026 · planning reference given

Planning 2660277 · Planning application · Council file · external

Commencement notices
1
Latest start date
01 Sep 2026
Latest notice
1 unit
Planning reference
2660277
Location
Kildare, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Kildare, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 2660277. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

(i) Construction of single storey extensions to side and rear of existing dwelling, (ii) Alterations to existing layouts and elevations, (iii) Conversion of existing attic space, to include an additional bedroom, (iv) Alterations and renovations to existing domestic garage to sub-divide existing space to form new home office & gym and separate garage space, (v) All associated and ancillary works. Revised by Significant Further Information which consists of: Retention of detached domestic garage as constructed on site and retention of upgraded of waste water treatment system

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 322 m².

Planning reference 2660277

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.