Commencement notice group

Building extension commencement notices — Ashford

Ashford, Wicklow

1 unique commencement event · latest notified commencement 06 Oct 2025 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
06 Oct 2025
Latest notice
180 m²
Planning references supplied
24/60591
Public location
Ashford, Wicklow

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Ashford, Wicklow
County
Wicklow

Notice location variants

  • ground floor level, and associated ground works and upgrade of wastewater treatment system CN0134259WW
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Wicklow County Council planning record Application details, status and decision record for 24/60591. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0134259WW BCMS owner-supplied export

provision of new single story rear and side extension with 4no roof lights and new front porch extension and reconfiguration of existing windows to front, side and rear elevations all at ground floor level, and associated ground works and upgrade of wastewater treatment system.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 180 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference 24/60591 Builder stated: Ccb Building Company (Trading As Oak Ridge Building Co.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.