Site start

Housing site start — Carrickmacross

Carrickmacross, Monaghan

2 commencement notices · latest start date 07 May 2026 · planning reference given

Planning 2460415 · Planning application · Council file · external

View full project timeline

Commencement notices
2
Latest start date
07 May 2026
Latest notice
5 houses
Planning reference
24/60415
Location
Carrickmacross, Monaghan

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning 24/60415 — CONDITIONAL · Decision 2025-06-16 · Final grant 2025-07-18

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Carrickmacross, Monaghan
County
Monaghan
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Monaghan County Council planning record Application details, status and decision record for 24/60415. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Alteration/Extension /Construction of existing two-storey derelict outbuilding to incorporate 2 no. two-storey semi- detached dwellings together with all ancillary works; Construction of 3no. two-storey dwellings, Alterations of courtyard access to include relocation of stone pier, Alterations of existing vehicular entrance and access road to include widening and set back of stone piers & gates, from the public road; Connection to public foul drainage with storm drainage to be accommodated within site boundaries; Open space, boundary treatments and all associated site works

Work stated for this notice 5 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 950 m².

Planning reference 24/60415 Developer stated: Clarlan Ltd
Notice 2 Commencement notice (owner-supplied)

Demolition and reconstruction of the existing entrance pier together with enabling works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1 m².

Planning reference 24/60415 Developer stated: Clarlan Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.