Site start
Housing site start — Dublin
Dublin 2, Dublin
1 commencement notice · start date 15 Feb 2018 · planning reference given
Planning 3886/17
- Commencement notices
- 1
- Latest start date
- 15 Feb 2018
- Latest notice
- Scale not stated
- Planning reference
- 3886/17
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- lower ground floor from residential to office use, together with internal partitioned layout
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: i) Change of use at lower ground floor from residential to office use, together with internal partitioned layout; ii) Alterations at lower ground floor level to comprise removal of non-original double glazed door and glazed side panels on the rear elevation of the main building, to allow reinstatement of original window ope comprising sliding sash window, stone cill and brickwork to cill level; alterations to non-original glazed screen to the interior of the building, at the division of the main building with the rear return, allowing the reinstatement of an original internal ope; installation of new fire-rated lobby within the rear return; iii) Alterations at first floor level to comprise removal of non-original double glazed doors and 'juliet balcony' on the rear elevation of the main building to allow re-instatement of original projecting bay window; and iv) All ancillary works necessary to facilitate the development. The development does not result in any change to the floor area or footprint of the building, nor any alterations to the front facade.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.