Site start
Building extension site start — Dublin
Dublin 5, Dublin
1 commencement notice · start date 01 Jun 2021 · planning reference given
Planning 4745/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 01 Jun 2021
- Latest notice
- 30 m²
- Planning reference
- 4745/19
- Location
- Dublin 5, Dublin
Location
Where the site is
- Area
- Dublin 5, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
convert existing attic space into non habitable storage that includes dormer to side of existing roof to accommodate attic stairs, Fakro EDD rooflight dormer to rear, 4 rooflights to side including a light tunnel and replacing front elevation sliding door to a window along with ancillary works.
Floor area stated for this source: 30 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.