Site start
Construction of New Visual Control Tower
Swords, Dublin
2 commencement notices · latest start date 04 Sep 2017 · planning reference given
Planning SID/01/09 06F.PA0014
- Commencement notices
- 2
- Latest start date
- 04 Sep 2017
- Latest notice
- Scale not stated
- Planning reference
- 01/09
- Location
- Swords, Dublin
Location
Where the site is
- Area
- Swords, Dublin
- County
- Dublin
Addresses on the notices
- entrance to car park along with all associated access and ancillary works
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of New Visual Control Tower together with Admin/Support Building and Security Building at entrance to car park along with all associated access and ancillary works.
Source unit value with scope not stated: 2 units. It is not presented as notice-specific scale.
The works in summary consist of the following: 1. Services Diversions (10 kV cable, Comm’s cables). 2. Site fencing (realignment of existing and installation of new fencing). 3. The construction of a new surface car park and attenuation tank with all associated kerbs, surfacing, line marking, signage, barriers systems, etc) to the south of the existing staff car park and entrypoint into the IAA complex. 4. The provision of a temporary Security Hut 5. Installation of site lighting/ CCTV and services for a future Security Hut. 6. Landscaping: low level planting and grass seeding. 7. Site clearance (existing car park). Removal of top wearing course and kerbs, drains, etc from the existing staff car park. 8. Minor site investigations.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.