Site start

Commercial site start — Dublin

Dublin

1 commencement notice · start date 15 Sep 2026 · planning reference given

Planning 5699/25

Commencement notices
1
Latest start date
15 Sep 2026
Latest notice
269 m²
Planning reference
5699/25
Location
21-24 Upper Merrion Place, Dublin

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • 21-24 Upper Merrion Place, Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Proposed Material Alterations to existing Staff Changing Rooms at Basement Level and the associated repurposing of a portion of the basement car park to provide additional staff changing facilities at the Merrion Hotel, Merrion Street, Dublin 2

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 269 m².

Planning reference 5699/25 Developer stated: Merrion Hotel Limited

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.