Site start
Building extension site start — Victoria Quay
Victoria Quay, Dublin
1 commencement notice · start date 24 Sep 2014 · planning reference given
Planning 2503/14
- Commencement notices
- 1
- Latest start date
- 24 Sep 2014
- Latest notice
- Scale not stated
- Planning reference
- 2503/14
- Location
- Victoria Quay, Dublin
Location
Where the site is
- Area
- Victoria Quay, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The project consists of the construction of 12 no. external tank structures to a maximum height of approx. 27.15M (32.590 O.D.) including enclosing single storey support building containing associated plant as an extension to the existing Cold Block (Fermentation and Beer Processing) tanking storage facility constructed as part of the scope of the newly constructed Brewhouse Development (planning ref: 3730/11)within the Guinness Brewery Lands to the North of James’s Street. Bounded by Victoria Quay to the North, Watling Street to the East, Steeven’s Lane to the West and James’s St to the South . The development includes the demolition of an existing two storey over basement administrative building (Logistics Building) and associated site works. Phase 1 will consist of construction of 6 no. external tank structures with the remaining 6 tank structures to be installed as part of phase 2.