Site start
Housing site start — Killenard
Killenard, Laois
2 commencement notices · latest start date 22 Apr 2024 · planning reference given
Planning 21/643 · Council file · external
- Commencement notices
- 2
- Latest start date
- 22 Apr 2024
- Latest notice
- 79 houses
- Planning reference
- 21/643
- Location
- Killenard, Laois
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 2
- Completion certificates
- 3
- Open exact official planning record: 21/643 Laois County Council · checked 2026-07-29T15:41:08+00:00
Planning 21/643 — CONDITIONAL · Decision 2021-12-20 · Final grant 2022-02-16
Exact appeal 312590 · Appeal withdrawn · 2022-02-14 · Open official case
- Completion certificate recorded — source scope not stated Laois County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-04 8 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Laois County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-04 4 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Laois County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-04 4 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Killenard, Laois
- County
- Laois
Addresses on the notices
- Millers Hill, Killenard, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official drawings and scanned-file sources are available below.
Official public-body drawings or scanned planning files are available for this development.
Use the site layout in the official drawings or scanned files to identify the house type assigned to houses 1–28, then open the corresponding house-type drawing.
-
Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 21/643. Laois County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official scanned files · external
-
Architecture Drawings Site location map Exact official drawing for 21/643. Laois County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Architecture Drawings Planning Pack Map Exact official drawing for 21/643. Laois County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Official planning file Laois County Council planning record Application details, status and decision record for 21/643. Laois County Council Official link · last checked 29 Jul 2026 Exact official source shared from the planning and approval record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development of 79 residential units comprising of 20 no. 3 bed semi- detached houses, 36 no. 4 bed semi- detached houses, 14 no. 4 bed detached houses, 4 no. 3 bed end terraces, 3 no. 2 bed mid terraces, 2 no. 3 bed bungalows; a new vehicular entrance from the L3171 Killenard Road; a separate pedestrian/ cycle access from the L3171 Killenard Road; public realm landscaping; provision of all associated surface water and foul drainage services and connections ancillary to the development; and all associated site development works.
Floor area stated for this source: 11,163 m².
Erection of 28 two- storey dwellings forming Phase 1 (House Nos. 1 to 28) at Millers Hill, Killenard, Co. Laois. Phase 1 comprises 22 semi-detached (4No. Type A1, 4No. Type A2, 1No. Type A3, 1No. Type A4, 1No. Type B1, 1No. Type B2, 2No. Types B3, 2No. Type B4, 3No. Types D1, 3No. Type D2) and 6 detached dwellings (3No. Types F1, 2No. Type F2, 1No. Type F3).
Floor area stated for this source: 4,240 m².
Source unit value with scope not stated: 28 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.