Commencement notice group

CGL school — commencement notices

Tralee, Kerry

1 unique commencement event · latest notified commencement 09 May 2018 · planning reference supplied

Unique commencement events
1
Latest notified commencement
09 May 2018
Latest notice
600 m²
Planning references supplied
15/303
Public location
Tralee, Kerry

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Tralee, Kerry
County
Kerry

Notice location variants

  • Colaiste Gleann Li,to erect a smoking shelter at KCFE for all associated siteworks including new perimeter fencing to the KCFE and C CN0041004KY
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0041004KY BCMS open-data feed

to demolish existing link structure, between the Kerry College of Further Education(KCFE) and Colaiste Gleann Li (CGL), to construct a single storey extension to the front of the CGL school complete with a new ramped entrance and to alter the existing classroom layout to form an entrance lobby , office and corridor. to construct a single storey extension to the rear of the CGL school comprising of two classrooms, changing facilities , specialist educational accommodation including multi sensory room / group room and creative arts space and associated administration office, metalwork room and new boiler house, to erect floodlighting to the all weather pitch at Colaiste Gleann Li,to erect a smoking shelter at KCFE for all associated siteworks including new perimeter fencing to the KCFE and CGL grounds

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 600 m².

Planning reference 15/303

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.