Oak Park — commencement notices

Portlaoise, Laois

1 unique commencement event · latest notified commencement 04 Jan 2022 · planning basis not stated

Unique commencement events
1
Latest notified commencement
04 Jan 2022
Latest notice
750 m²
Planning references supplied
None stated
Public location
Portlaoise, Laois

Public source geography

Site location

Public site / locality
Portlaoise, Laois
County
Laois

Public site labels seen across the notices

  • Oak Park, Knockmay, Portlaoise, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0084893LS BCMS open-data feed

The development will consist of the construction of four no. two bay halting sites and all associated works at Oak Park, Knockmay, Portlaoise, Co. Laois accessed from the R945 and to the north by agricultural land. Details of serviced bays: 4 no. day houses each serving two caravan bays. Each unit is 46sqm and includes shower room, laundry store and family room. The development also includes foul and surface water drainage works along the footpaths. There are a total of four no. two bay serviced halting sites and all associated site works within the site curtilage.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 750 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.