Site start
Commercial site start — Ballymahon
Ballymahon, Longford
1 commencement notice · start date 01 Sep 2014 · planning reference given
Planning PL13/214
- Commencement notices
- 1
- Latest start date
- 01 Sep 2014
- Latest notice
- 1 unit
- Planning reference
- PL13/214
- Location
- Ballymahon, Longford
Location
Where the site is
- Area
- Ballymahon, Longford
- County
- Longford
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed construction of a shop front onto the front facade of existing two storey building which forms the streetscape of the Main Street of Ballymahon together with seeking full planning permission to change the use of the existing ground floor into a commercial/retail/cafe shop/office/medical unit together with the proposed construction of a two storey extension to the rear which will service the proposed uses at ground floor level and provide habitable accommodation at first floor level of both the existing two storey building and the proposed two storey extension and all ancillary works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.