Site start

Building extension site start — Carrigtwohill

Carrigtwohill, Cork

3 commencement notices · latest start date 06 Nov 2023 · planning reference given

Planning 23/4159 · Planning application

Commencement notices
3
Latest start date
06 Nov 2023
Latest notice
1,475 m²
Planning reference
23/04159
Location
Carrigtwohill, Cork

Location

Where the site is

Area
Carrigtwohill, Cork
County
Cork

Addresses on the notices

  • AbbVie - Construction of Part 3 Storey/ Part 2 Storey Extension to Existing Production Building with Associated Site Development Works
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Juvederm Extension at AbbVie - Construction of Part 3 Storey/ Part 2 Storey Extension to Existing Production Building with Associated Site Development Works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,475 m².

Planning reference 23/04159
Notice 2 Seven-day notice

Juvederm Project at AbbVie Cork - Erection of 1 No Prefabricated Two Storey Modular Building (Portakabin) to provide ancillary accommodation for Administration Purpose (Meeting Rooms, Offices, Welfare Facilities).

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 840 m².

Planning reference 23/04159
Notice 3 Seven-day notice

Juvederm Project at AbbVie Cork - Erection of 1 No Prefabricated Two Storey Modular Building (Portakabin) to provide ancilalry accommodation for Administration Purpose (Canteen, Meeting Rooms, Offices, Welfare Facilities)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 762 m².

Planning reference 23/04159

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.