Commencement notice group
Building extension commencement notices — Camolin
Camolin, Wexford
2 unique commencement events · latest notified commencement 13 Nov 2024 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 13 Nov 2024
- Latest notice
- 66 m²
- Planning references supplied
- 20230778
- Public location
- Camolin, Wexford
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 20230778 Wexford County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Camolin, Wexford
- County
- Wexford
Notice location variants
- the north side
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wexford County Council planning record Application details, status and decision record for 20230778. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of new metal-clad outbuilding (66 square metres) located adjacent to west (rear) boundary, together with associated site works and parking area
Floor area stated for this source: 66 m².
(a) construction of a new single-storey extension (50 square metres) at the north side; (b) renovation of existing extension at west side, including re-roofing and alterations to window and door openings; (c) removal of two redundant chimneys; (c) demolition of existing porch and construction of new entrance canopy porch at east elevation; (d) alteration and enlargement of existing gateway to provide set back splayed entrance with new timber post and rail fence
Floor area stated for this source: 50 m².
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.