Site start
Housing site start — Lucan
Lucan, Dublin
8 commencement notices · latest start date 02 Dec 2022 · planning references given
Planning SDZ19A/0008 SDZ20A/0014
- Commencement notices
- 8
- Latest start date
- 02 Dec 2022
- Latest notice
- 12 units
- Planning references
- SDZ19A/0008 · SDZ20A/0014
- Location
- Lucan, Dublin
Location
Where the site is
- Area
- Lucan, Dublin
- County
- Dublin
Addresses on the notices
- Hallwell Adamstown - Nos
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Further to submission no. 8485078, this commencement notice if for the superstructure & completion of Block D, Hallwell Residential Development, Tubber Lane Road, Dublin
Floor area stated for this source: 1,282 m².
Foundation and rising wall elements of Block C & E, Hallwell Residential Development, Tubber Lane Road, Dublin
Floor area stated for this source: 1,368 m².
Source unit value with scope not stated: 42 units. It is not presented as notice-specific scale.
Foundation and rising elements of Block D, Hallwell Residential Development, Tubber Lane Road, Dublin
Floor area stated for this source: 526 m².
Source unit value with scope not stated: 12 units. It is not presented as notice-specific scale.
Commencement of foundation and rising elements of Block B, Hallwell Residential Development, Tubber Lane Road, Dublin
Floor area stated for this source: 2,584 m².
Source unit value with scope not stated: 25 units. It is not presented as notice-specific scale.
Commencement of foundation and rising elements of Block A, Hallwell Residential Development, Tubber Lane Road, Dublin
Floor area stated for this source: 1,692 m².
Source unit value with scope not stated: 16 units. It is not presented as notice-specific scale.
Construction of No. 3 houses at Hallwell Adamstown - Nos. 27 - 31 (Odd) Hallwell Avenue, Lucan, Co. Dublin
Floor area stated for this source: 364 m².
Source unit value with scope not stated: 94 houses. It is not presented as notice-specific scale.
Construction of No. 16 houses at Hallwell Adamstown - Nos. 62 - 70 (Cons.) Hallwell Avenue, and 32 - 42 (Cons.) Hallwell Lane, Lucan, Co. Dublin
Floor area stated for this source: 1,857 m².
Construction of No. 16 houses at Hallwell Adamstown - Nos. 2 - 32 (Cons.) Hallwell Avenue, Lucan, Co. Dublin
Floor area stated for this source: 1,935 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.