Site start
Building extension site start — Phibsborough
Phibsborough, Dublin
1 commencement notice · start date 26 Jan 2016 · planning reference given
Planning 3354/15
- Commencement notices
- 1
- Latest start date
- 26 Jan 2016
- Latest notice
- Scale not stated
- Planning reference
- 3354/15
- Location
- Phibsborough, Dublin
Location
Where the site is
- Area
- Phibsborough, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
External works: the demolition of the non original single storey extension, coalshed; removal of non original concrete paving and landscaping to front garden and replace with gravel and granite; construction of new 2.6m2 single storey extensions to ground floor of rear return; break down cills to rear return windows to form door openings; provision of new French doors to ground floor of rear return; repair of natural slate roof, soffit and eaves, rain water gutters and downpipes; provision of new roof light to east face of return roof; provision of new solar panel to south face of return roof; removal of non original cement render from rear return and replacement with lime render; refurbishment of original timber sash windows, bay windows, front door & fanlight and replacement of non original glass with slimline double glazing; provision of vehicular access gates to non-original rear garden block work wall; replace non original timber door & window to side passage with new; clean and paint original iron railings; close off gateway between rear gardens of nos.35 & 37 NCR; Internal Works: removal of non original fixtures, fittings and asbestos material; repair / reinstatement of all fire damaged joinery; provision of new breathable internal insulation to rear return walls; alterations to non original partitions to second floor of rear return; relocation of original bathroom door opening; replacement of all non original sanitary ware; repair of fire damaged original plasterwork; reline original flues and reinstate fireplaces; upgrading of mechanical electrical and plumbing services and decoration and all associated site works.
Overall development total stated in source: 1 unit.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.