Commencement notice group
Housing commencement notices — Rush
Rush, Dublin
5 unique commencement events · latest notified commencement 19 Jan 2026 · planning reference supplied
- Unique commencement events
- 5
- Latest notified commencement
- 19 Jan 2026
- Latest notice
- 46 m²
- Planning references supplied
- ABP-316065-23
- Public location
- Rush, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Rush, Dublin
- County
- Dublin
Notice location variants
- Dublin, Dublin SN0012444FL
- ground floor SN0010242FL
- Notice source points are up to 312 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0137585FL · 53.524519, -6.092444 Open point
- SN0012444FL · 53.526905, -6.093935 Open point
- SN0012188FL · 53.526266, -6.094162 Open point
- SN0010242FL · 53.524314, -6.094030 Open point
- SN0010100FL · 53.524117, -6.094502 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-316065-23. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of bike store.
Floor area stated for this source: 46 m².
Construction of a two story new build creche.
Floor area stated for this source: 398 m².
Construction of bin and bike store.
Floor area stated for this source: 97 m².
Block A is a four-storey residential building consisting of ground floor plus three upper levels. The block is divided into 2no. sub-blocks – Block A1 and Block A2. Block A1 will contain 16no. apartments and ancillary accommodations. The ancillary accommodations will consist of a switch room, bin store and bike store. They are located at ground floor. Block A2 will consist solely of 14no. apartments.
Floor area stated for this source: 3,182 m².
Block B is a three-storey residential building consisting of ground floor plus two upper levels. Ground to second floor will consist of 15no. apartments.
Floor area stated for this source: 1,500 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.