Site start

Housing site start — Lahinch

Lahinch, Clare

3 commencement notices · latest start date 16 Jul 2019 · planning reference given

Planning 16240 · Council file · external

Commencement notices
3
Latest start date
16 Jul 2019
Latest notice
208 m²
Planning reference
16240
Location
Lahinch, Clare

Location

Where the site is

Area
Lahinch, Clare
County
Clare

Addresses on the notices

  • site no
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

construction of new house at site no. 7a

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 208 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 16240
Notice 2 Commencement notice (owner-supplied)

Completion and construction of house no.'s 8 and 7b which form part of 9 No. 3 bedroom split level holiday homes with access from the existing entrance to the caravan park and all associated site works as part of works granted under planning ref P04-1515, An Bord Pleanála Reference PL03.220248 and planning ref. P07-2931

Work stated for this notice Scale not stated for this notice.

Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.

Planning reference 16240
Notice 3 Commencement notice

Construction and completion of no. 9 which forms part of 9 No. 3 bedroom split level holiday homes with access from the existing entrance to the caravan park and all associated site works as part of works granted under planning ref P04-1515, An Bord Pleanála Reference PL03.220248 and planning ref. P07-2931

Work stated for this notice 1 house Explicit phase quantity stated by the source.
Planning reference 16240

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.