Site start
Housing site start — Galway City
Galway City, Galway
5 commencement notices · latest start date 07 Sep 2018 · planning reference given
Planning 14/240 · Council file · external
- Commencement notices
- 5
- Latest start date
- 07 Sep 2018
- Latest notice
- 4 houses
- Planning reference
- 14/240
- Location
- Galway City, Galway
Location
Where the site is
- Area
- Galway City, Galway
- County
- Galway
Addresses on the notices
- Galway
- Cúirt Chéirín, Circular Road, Galway City
- site 2, Cuirt Cheirin, Circular Road
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Overall project involves Construction of 17 no. Dwellings on existing serviced site at Cúirt Chéirín, Circular Road, Galway City. The Development will be carried out in approximately 4-5 phases. Phase 1 - 6 no. Dwellings, Phase 2 - 4 no. Dwellings, Phase 3 - 1 No. Dwelling, phase 4 - 4 Units, with subsequent phases to be confirmed. This Commencement Notice relates to Phase 4 (Unit 24 - 27).
Floor area stated for this source: 1,252 m².
Overall project involves Construction of 17 no. Dwellings on existing serviced site at Cúirt Chéirín, Circular Road, Galway City. The Development will be carried out in approximately 4-5 phases. Phase 1 - 6 no. Dwellings, Phase 2 - 4 no. Dwellings, Phase 3 - 1 No. Dwelling, with subsequent phases to be confirmed. This Commencement Notice relates to Phase 3 (Unit 29).
Source unit value with scope not stated: 17 houses. It is not presented as notice-specific scale.
Overall project involves Construction of 17 no. Dwellings on existing serviced site at Cúirt Chéirín, Circular Road, Galway City. The Development will be carried out in 3 phases. Phase 1 - 6 no. Dwellings, Phase 2 - 4 no. Dwellings, Phase 3 - 6 No. Dwellings. This Commencement Notice relates to Phase 2.
Construction of 17no. Dwellings on existing serviced site at Cúirt Chéirín, Circular Road, Galway City. The Development will be carried out in 3 phases. Phase 1 - 6 no. Dwellings, Phase 2 - 6 no. Dwellings, Phase 3 - 5 No. Dwellings
Construction of new detached 1 1/2 storey dwelling house on existing serviced site at site 2, Cuirt Cheirin, Circular Road.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.