Site start
Housing site start — Ratoath
Ratoath, Meath
2 commencement notices · latest start date 14 Dec 2020 · planning references given
Planning RA/190874 & RA/200053
- Commencement notices
- 2
- Latest start date
- 14 Dec 2020
- Latest notice
- 3 houses
- Planning references
- RA/190874 · RA/200053
- Location
- Ratoath, Meath
Location
Where the site is
- Area
- Ratoath, Meath
- County
- Meath
Addresses on the notices
- Dunshaughlin Road, Ratoath, Co
- the front, landscaping and associated site works
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Phase 3: the remaining 3 no. two-storey terraced houses of 13 no. houses and all associated site works at Dunshaughlin Road, Ratoath, Co. Meath
Floor area stated for this source: 380 m².
Completion of boundary wall treatment, road access, landscaping of Phase 1, and construction of Phase 2: 7 of 13 no. houses, including 4 no. two-storey semidetached houses and 3 no. two-storey terraced houses, with car parking areas at the front, landscaping and associated site works.
Floor area stated for this source: 892 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.