Site start
Site start — Dublin
Dublin 2, Dublin
1 commencement notice · start date 07 Jun 2018 · planning reference given
Planning 3763/17
- Commencement notices
- 1
- Latest start date
- 07 Jun 2018
- Latest notice
- 468 m²
- Planning reference
- 3763/17
- Location
- 39-40 Dawson Street, Dublin 2
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- 39-40 Dawson Street, Dublin 2
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
7-Day Notice - Material alteration to existing rear bar including reduction in existing floor area due to the removal of the existing first floor dance floor and mezzanine level of Cafe en Seine
Floor area stated for this source: 468 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.