Site start

Building extension site start — Dundalk

Dundalk, Louth

1 commencement notice · start date 05 Jul 2019 · planning reference given

Planning 181037 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
05 Jul 2019
Latest notice
697 m²
Planning reference
181037
Location
Dundalk, Louth

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Partial completion certificate recorded Louth County Council · commencement notice Completion certificate · First observed in the official monthly source 2019-07 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Dundalk, Louth
County
Louth
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Louth County Council planning record Application details, status and decision record for 181037. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Proposed new works to the front elevation which will include relocating entrance doors, replacing existing entrance with a window, replacing second window, removing steps and adding an internal accessible ramp and new replacement signage to existing fascia. Proposed new works to basement will include an extension to provide a larger toilet block. Proposed new works to ground floor will consist of layout changes to provide revised bar areas, ancillary areas and open courtyard. Proposed new works to first floor will include layout changes to provide revised bar area and ancillary areas to include new kitchen. A new small flat roof extension to rear and removal of section of floor in centre of building and construction of new gable wall to create open courtyard below. Proposed new works to roof will include partial removal of non-original roof, to create open courtyard below including new raised parapet wall. Proposed new flat roof over new extension to rear, relocation of existing plant and provision for new kitchen extract.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 697 m².

Planning reference 181037

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.