Commencement notice group

Housing commencement notices — Roscommon

Roscommon, Roscommon

1 unique commencement event · latest notified commencement 27 Nov 2019 · planning basis not stated

Unique commencement events
1
Latest notified commencement
27 Nov 2019
Latest notice
7 houses
Planning references supplied
None stated
Public location
Roscommon, Roscommon

Planning-anchored public geography

Site identity and location

Canonical public locality
Roscommon, Roscommon
County
Roscommon
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0059482RN BCMS open-data feed

The Proposed Development will comprise of a)7 No. residential units as follows: (i) 4 No. Semi Detached 2-Bed Single Storey Houses,(ii) 2 No. Detached 2-Bed Single Storey Houses, (iii) 1 No. Detached 3-Bed Single Storey House, (b) all associated site works including construction of footpath, roads, car parking area, bin store area, street lighting, ducting for utilities, formation of new connections to existing foul and surface water drainage, and existing utilities and including all demolition and removal from site of waste materials.

Work stated for this notice 7 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 1,501 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.