Site start

Housing site start — Keshcarrigan

Keshcarrigan, Leitrim

1 commencement notice · start date 14 Dec 2024 · planning reference given

Planning PT8LM73 · Planning application

Commencement notices
1
Latest start date
14 Dec 2024
Latest notice
110 m²
Planning reference
PT8LM73
Location
Keshcarrigan, Leitrim

Location

Where the site is

Area
Keshcarrigan, Leitrim
County
Leitrim
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Erection of mixed residential development of 4 no. dwellings (4 no. 1 bedroom), access via existing service road, connect to public foul and storm water sewers, public watermains & all ancillary works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 110 m².

Source unit value with scope not stated: 4 houses. It is not presented as notice-specific scale.

Planning reference PT8LM73

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.