Site start
Drogheda Grammar School — site start
Drogheda, Meath
1 commencement notice · start date 03 Feb 2021 · planning reference given
Planning LB/191565
- Commencement notices
- 1
- Latest start date
- 03 Feb 2021
- Latest notice
- 381 m²
- Planning reference
- LB/191565
- Location
- Mornington Road, Drogheda, Meath
Location
Where the site is
- Area
- Drogheda, Meath
- County
- Meath
Addresses on the notices
- Mornington Road, Drogheda, Meath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of a disused external swimming pool and 2no. prefabricated buildings to the north-west of the existing school buildings at Drogheda Grammar School, construction of a new two-storey replacement classroom block to the north-west side of existing teaching block, consisting of 4no. classrooms, office and toilets and all associated site work at Mornington Road, Drogheda, Co. Meath which is in the curtilage of a protected structure – Eden View House, Ref. MH021-100
Floor area stated for this source: 381 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.