Site start

Refurbishment and extension to WH Smith Store

Shannon Airport, Clare

1 commencement notice · start date 26 Feb 2019 · no planning reference given

Commencement notices
1
Latest start date
26 Feb 2019
Latest notice
227 m²
Planning references
None given
Location
Shannon Airport, Clare

Location

Where the site is

Area
Shannon Airport, Clare
County
Clare

Addresses on the notices

  • ground floor level of Main Terminal Building, Shannon Airport
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Seven-day notice

Refurbishment and extension to WH Smith Store at ground floor level of Main Terminal Building, Shannon Airport. Works to include strip-out, minor demolitions, installation of new metal stud partitions and new suspended ceiling grid and tiles; installation of mechanical, electrical and sprinkler services.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 227 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.