Site start
Building extension site start — Dublin
Dublin 9, Dublin
1 commencement notice · start date 14 Feb 2024 · planning reference given
Planning 4553/18
- Commencement notices
- 1
- Latest start date
- 14 Feb 2024
- Latest notice
- 1,990 m²
- Planning reference
- 4553/18
- Location
- Dublin 9, Dublin
Location
Where the site is
- Area
- Dublin 9, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new Cystic Fibrosis Facility to the existing Beaumont Hospital. The extension consists of 3 floor levels and is served by two stairs; one from the existing building and a newly constructed stair within the facility.
Floor area stated for this source: 1,990 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.