Commencement notice group

Housing commencement notices — Balraheen

Balraheen, Meath

1 separate notice · latest notified commencement 27 Apr 2026 · planning reference supplied

Source notices
1
Latest notified commencement
27 Apr 2026
Latest notice
1 home
Planning references supplied
25/60721
Public location
Balraheen, Meath

Public source geography

Site location

Public site / locality
Balraheen, Meath
County
Meath
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Meath County Council · reference 25/60721 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference25/60721

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0140741MH BCMS owner-supplied export

the development will consist of the partial demolition of existing dwelling, the demolition of outhouses, upgrade works to existing dwelling house, the construction of a two storey and single storey extension, the construction of a domestic garage, the upgrading of existing septic tank to a wastewater treatment unit and percolation area and all associated site works

1 home · 239 m² · stated on this notice

Planning reference 25/60721

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.