Site start

Building extension site start — Beaumont

Beaumont, Dublin

1 commencement notice · start date 02 Feb 2017 · planning reference given

Planning 3379/16

Commencement notices
1
Latest start date
02 Feb 2017
Latest notice
Scale not stated
Planning reference
3379/16
Location
Beaumont, Dublin

Location

Where the site is

Area
Beaumont, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Planning permission is sought comprising of (i) Two storey side extension with 1 no. roof light on rear roof slope and canopy to front elevation extending above existing front porch (following demolition of existing single storey side garage); (ii) Single storey rear extension with 2 no. roof lights; (iii) Dormer window and 1 no. roof light to rear roof slope of existing roof.

Work stated for this notice Scale not stated for this notice.
Planning reference 3379/16

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.