Commencement notice group

Housing commencement notices — Waterfall

Waterfall, Cork

2 separate notices · latest notified commencement 04 May 2021 · planning references supplied

Source notices
2
Latest notified commencement
04 May 2021
Latest notice
10 units
Planning references supplied
17/6373 · 20/4983
Public location
Waterfall, Cork

Public source geography

Site location

Public site / locality
Waterfall, Cork
County
Cork
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference17/6373
Planning reference20/4983

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0074691CC BCMS open-data feed

Construction of Residential Units 20 to 29 Earls Well, Waterfall, Co. Cork.

10 units · 2,421 m² · stated on this notice

Planning reference 17/6373 Planning reference 20/4983
CN0071928CC BCMS open-data feed

Construction of units 18, 19 & 30 to 33 Earls Well, Waterfall, Co. Cork

6 units · 1,530 m² · stated on this notice

Planning reference 17/6373 Planning reference 20/4983

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.