Commencement notice group

Commencement notices — Kilmallock

Kilmallock, Limerick

1 separate notice · latest notified commencement 11 Dec 2018 · planning reference supplied

Source notices
1
Latest notified commencement
11 Dec 2018
Latest notice
308 m²
Planning references supplied
18/777
Public location
Kilmallock, Limerick

Public source geography

Site location

Public site / locality
Kilmallock, Limerick
County
Limerick
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Limerick City and County Council · reference 18/777 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference18/777

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0046647LL BCMS owner-supplied export

Provision of fire alarm and emergency lighting to facilitate off licence.

308 m² · stated on this notice

Planning reference 18/777 Builder stated: Neillhiggins Ltd Developer stated: Neillhiggins Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.