Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
4 unique commencement events · latest notified commencement 06 Jun 2023 · planning basis not stated
- Unique commencement events
- 4
- Latest notified commencement
- 06 Jun 2023
- Latest notice
- 16,576 m²
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
Notice location variants
- roof level, with rainwater harvesting system to support industrial water requirements, 16 no
- Notice source points are up to 367 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.409334, -6.220268 Open point
- Public notice source · 53.408825, -6.220741 Open point
- Public notice source · 53.407877, -6.225232 Open point
- Public notice source · 53.409455, -6.223152 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Building F. 2-storey data centre building (16,576 sqm), including Office, data halls, associated electrical and mechanical plant rooms, a loading bay, maintenance and storage spaces, screened plant and solar panel array at roof level, with rainwater harvesting system to support industrial water requirements, 16 no. emergency generators with emission stacks along with a single emergency house supply generator, all contained in a fenced compound, diesel storage tank, fuel filling area and associated plant.
Floor area stated for this source: 16,576 m².
Single-storey sprinkler pumproom.
Floor area stated for this source: 70 m².
Single-storey substation Client Control Building.
Floor area stated for this source: 220 m².
2-storey data centre building (16,576 sqm), including Office, data halls, associated electrical and mechanical plant rooms, a loading bay, maintenance and storage spaces, screened plant and solar panel array at roof level, with rainwater harvesting system to support industrial water requirements, 16 no. emergency generators with emission stacks along with a single emergency house supply generator, all contained in a fenced compound, diesel storage tank, fuel filling area and associated plant.
Floor area stated for this source: 16,576 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.