Site start
Site start — Carrigeen
Carrigeen, Kilkenny
1 commencement notice · start date 23 Jun 2021 · planning references given
Planning 16/193 - 18/61 · Council file · external
- Commencement notices
- 1
- Latest start date
- 23 Jun 2021
- Latest notice
- 32 m²
- Planning references
- 16/193 · 18/61
- Location
- Carrigeen, Kilkenny
Location
Where the site is
- Area
- Carrigeen, Kilkenny
- County
- Kilkenny
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A solar PV energy development of maximum export capacity 4MV, to include one ESB Network substation building with a height not exceeding of 4m, two electrical transformer stations with a height of 2.7m, site access roads and solar PV panels mounted on steel support structures 2.5m in height, associated cabling and ducting and fencing works.
Floor area stated for this source: 32 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.