Commencement notice group
Commercial commencement notices — Cong
Cong, Galway
1 unique commencement event · latest notified commencement 18 Feb 2015 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 18 Feb 2015
- Latest notice
- 1 unit
- Planning references supplied
- 14/669
- Public location
- Cong, Galway
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Cong, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The project will include: an extension to the existing hotel comprising a spa treatment facility (1,237sqm) arranged over three levels (basement, ground and mezzanine) located to the south of the eastern wing of the main hotel building including a swimming pool, fitness suite, treatment rooms, changing facilities, outdoor terrace and related ancillary areas. The development will also include a sub-basement ancillary plant level (89sqm) below the proposed new swimming pool; minor excavation works within the existing hotel at basement level to facilitate a proposed new children’s pool (26sqm) the removal and replacement of the existing internal staircase from basement to 2nd floor within the existing hotel and internal refurbishment works to facilitate leisure and amenity uses also at existing basement level. The development will also include hard and soft landscaping, external lighting, re-location and minor reconfiguration of previously permitted rood plant; new roof plant; solar panels at roof level; link between the proposed spa and existing hotel structure; changes in level; minor demolition works including the removal of two sets of existing external stone steps, single storey conservatory (40sqm) internal staircase, 2 no fire hydrants and internal basement walls; ancillary surface water and drainage works (including all connections, pipe work and increase in size of the previously permitted attenuation pipe) to serve the proposed development all ancillary site development and excavation works above and below ground.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.