Site start
Extension and Material Alteration to an existing hotel at the Morgan Hotel
Dublin 2, Dublin
2 commencement notices · latest start date 04 Dec 2017 · planning reference given
Planning 2535/17
- Commencement notices
- 2
- Latest start date
- 04 Dec 2017
- Latest notice
- 1 unit
- Planning reference
- 2535/17
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- the Morgan Hotel
- Dublin
- No
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension and Material Alteration to an existing hotel at the Morgan Hotel. The development will consist of a link corridor at first to fifth floor levels between the south (front) block and northern (rear) block (125 sq.m). Construction of a sedum green roof on the roof of the link; minor alterations to the internal layout to facilitate these works, including the subdivision of an existing mezzanine suite at first and second floor southern (front) block into two bedrooms, retention of the existing glazed facade to the norther (rear) block at fourth floor level with a facade treatment to match that proposed at fifth floor level; the inclusion of an additional lift core to the northern (rear) block, alteration and provision of plant at roof level. Minor alterations to the Fleet St. facade; and all other associated site excavation, infrastructural and site development works above and below ground.
Enabling works for alteration and extension of the Morgan Hotel at No.s 7-12 Fleet Street & 1-2 Aston Place, Dublin 2. To include demolition of existing facades for new link corridors, removal of internal partitions and finishes, and stripping of 4th floor to make way for fifth floor extension.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.