Housing site start — Inchicore

Inchicore, Dublin

1 commencement notice · start date 27 Nov 2024 · planning reference given

Planning WEB1200/22 · Planning application

View full project timeline

Commencement notices
1
Latest start date
27 Nov 2024
Latest notice
60 m²
Planning reference
WEB1200/22
Location
Inchicore, Dublin

Location

Where the site is

Area
Inchicore, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The development will consist of alterations and extension to the existing two storey end of terrace dwelling. The works will consist of (1) demolition of existing ground floor rear extension (2) construction of two- storey extension to the rear, (3) all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 60 m².

Planning reference WEB1200/22

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.