Site start

Building extension site start — Bailieborough

Bailieborough, Cavan

1 commencement notice · start date 04 May 2015 · planning reference given

Planning 14/245 · Council file · external

Commencement notices
1
Latest start date
04 May 2015
Latest notice
1 unit
Planning reference
14/245
Location
Bailieborough, Cavan

Location

Where the site is

Area
Bailieborough, Cavan
County
Cavan
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

(1) Erect 5 storey extension to the existing Dryer Facility to contain a new dryer plant; (2)Erect 3 storey extension to the existing dryer building to contain 2 no. evaporators;(3) Erect 3 storey extension to the existing milk powder silo area to incoporate new milk powder silos and milk powder handling;( 4) new car park spaces; (5) revised traffic arrangement; (6) New security hut and (7) erect 2 storey extension to the existing bagging area to contain additional bagging area and electrical control panels together with associated local underground drainage and miscellaneous site works including a 480m3 water tank.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference 14/245

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.