Commencement notice group
Housing commencement notices — Kilshanny
Kilshanny, Clare
1 unique commencement event · latest notified commencement 10 Jun 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 10 Jun 2026
- Latest notice
- 1 house
- Planning references supplied
- 2460623
- Public location
- Kilshanny, Clare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 2
- Exact completion events
- 0
- Open exact official planning record: 2460623 Clare County Council · checked 2026-08-01T20:54:12+00:00
Planning 2460623 — CONDITIONAL · Decision 2025-02-10 · Final grant 2025-06-19
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Kilshanny, Clare
- County
- Clare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official drawings and scanned-file sources are available below.
Public application drawings are available for this notice group.
Use the official drawings or scanned files to review the submitted plans and elevations.
-
Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official scanned files · external
-
Site Layout 2432 - A100-Proposed Site Layout Plan Exact official document for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official site layout · external
-
Site Layout 2432 - E102-Existing Site Layout Exact official document for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official site layout · external
-
Architecture Drawings 2432 - Plans-Sections-Elevations Exact official document for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Architecture Drawings 2432 - A000-Drawing Schedule Exact official document for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Architecture Drawings 2432 - Site Location Map Exact official document for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Architecture Drawings Environment Section Exact official document for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Official planning file Clare County Council planning record Application details, status and decision record for 2460623. Clare County Council Official link · last checked 01 Aug 2026 Exact official source shared from the planning and approval record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
a dwelling house, entrance, wastewater treatment system and all associated site works
Floor area stated for this source: 219 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.