Site start

Housing site start — Ranelagh

Ranelagh, Dublin

1 commencement notice · start date 26 Aug 2016 · planning reference given

Planning 3939/14

Commencement notices
1
Latest start date
26 Aug 2016
Latest notice
1 house
Planning reference
3939/14
Location
Ranelagh, Dublin

Location

Where the site is

Area
Ranelagh, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

PROTECTED STRUCTURE (RPS Ref.no.:5779): Development of ground and first floor extension to the rear of 95 Moyne Road, Ranelagh, Dublin 6. The proposed development consists of the demolition of a single storey extension and shed to rear, erection of a ground floor extension of 26 sq.m to rear of house and a first floor extension also to the rear of house of 26 sq.m (gross total area 52 sq.m) in a two storey block on the southern boundary with two proposed roof lights on the sought pitch of roof. The proposed development will also consist of re-slating of roof to the front and rear, re-building and re-pointing of shared chimney to the front with new flashing provided, replacement of existing windows to the front and rear and removal of chimney to the rear, general refurbishment and alterations to internal layout and associated site works.

Work stated for this notice 1 house Explicit phase quantity stated by the source.
Planning reference 3939/14

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.