Commencement notice group
Housing commencement notices — Birr
Birr, Offaly
1 unique commencement event · latest notified commencement 13 Feb 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 13 Feb 2026
- Latest notice
- 1 house
- Planning references supplied
- 2560046
- Public location
- Birr, Offaly
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 2560046 Offaly County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Birr, Offaly
- County
- Offaly
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Offaly County Council planning record Application details, status and decision record for 2560046. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension on a two - storey semi detached terrace house. works will consist of the demolition of an existing extension. Extension will consist of kitchen, bedroom, ensuite,walk in wardrobe and a-roof. Address: 3A Newbridge Street, Birr, Offaly. . The proposed extension shall be designed and constructed in accordance with Part L of the Building Regulations – Conservation of Fuel and Energy. The works shall be assessed using DEAP methodology, where applicable, and shall ensure that the existing dwelling is not adversely affected in terms of energy performance. All new building elements including walls, roofs, floors, windows and doors shall achieve U-values equal to or better than the limiting values set out in Part L. Reasonable measures shall be taken to limit heat loss through air infiltration, thermal bridging and junction detailing. Heating, hot water and ventilation systems serving the extension shall be efficient, appropriately controlled and compatible with the existing dwelling. Energy-efficient fixed lighting shall be installed throughout the extension. The completed works shall comply fully with the requirements of Part L.
Floor area stated for this source: 49 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.