Site start

Housing site start — Clonmellon

Clonmellon, Westmeath

1 commencement notice · start date 13 Apr 2026 · no planning reference given

Planning 261 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
13 Apr 2026
Latest notice
12 houses
Planning references
None given
Location
Clonmellon, Westmeath

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Clonmellon, Westmeath
County
Westmeath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Westmeath County Council planning record Application details, status and decision record for 261. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Demolition of public house and petrol station, Construction of 2 blocks of 5 no. 2 bedroom dwellings no.'s 3-7 and 11-15, and 2 no. semi-detached 3 bedroom dwellings no.'s 9 and 10.One-way street to north and west boundaries with shared vehicular/cycle pedestrian access, private linear street parking to serve the residents of the proposed development. New public street enhancement with street parking bays, new footpaths and pedestrian crossing link to the main street, seating, new tree planting and public lighting,Ancillary shelter structure to accommodate waste, including all ancillary site works. collection and recycling, bicycle storage and maintenance equipment storage to serve the management of the proposed residential amenities and services, Connection to all essential services, existing watermains, waste and surface watermain drainage on the site.

Work stated for this notice 12 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 1,038 m².

Developer stated: Patrick Powderly Construction Limited

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.