Commencement notice group
Commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 13 Nov 2025 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 13 Nov 2025
- Latest notice
- 1 house
- Planning references supplied
- D25A/0227/WEB
- Public location
- Dublin, Dublin
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Alterations to Lower Ground Floor / Rear Return consisting of: A) Alterations to internal layout throughout including removal of partitions / doors and formation of openings within existing internal walls; To include new kitchen fitout, new partitions and re-use of doors with new doors also; B) Alteration / conversion of existing window on rear return rear elevation to bay window; C) Infill of existing external side porch recess with wall / new window under rear return to provide relocated shower room with associated partial infill of modern window ope and associated partition alterations; D) Conversion of window to door on main house rear elevation; E) Provision of new shower / toilet room within main rear room with new associated partition layout. 2. Alterations to Upper Ground Floor / Rear Return consisting of: A) Removal of modern kitchen from return and relocation of new kitchen to main rear reception room and with associated services; B) New opening between front and rear main reception rooms to access above kitchen; C) Reconfiguration of existing landing shower room partitions to provide separate laundry and w.c. with new partitions in main return room (current kitchen); Removal of landing hot press and partition / door; D) New window opening to rear side return (south) elevation with obscured glazing. 3. Alterations to First Floor Rear Return consisting of: A) Reconfiguration of existing modern landing shower room / partitions and doors and provision of new partitions within rear return bedroom. Works will include general fabric conservation works and all associated site, drainage and landscaping works.
Floor area stated for this source: 308 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.