Site start

Housing site start — Naas

Naas, Kildare

1 commencement notice · start date 05 Oct 2015 · planning reference given

Planning 15/183 · Council file · external

Commencement notices
1
Latest start date
05 Oct 2015
Latest notice
Scale not stated
Planning reference
15/183
Location
Naas, Kildare

Location

Where the site is

Area
Naas, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Extensions and alterations to existing two storey house to include, (a) New two storey extensions to side and rear of existing house (b) Modifications to front elevation to include new window style and gable feature (c) New front porch extension (d) Modifications and alterations to existing layout (e) Sub-division of existing site , new boundary walls, new dual access site entrance and all associated site development works - OPT OUT

Work stated for this notice Scale not stated for this notice.
Planning reference 15/183

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.