Commencement notice group

Housing commencement notices — Maigh Cuilinn

Maigh Cuilinn, Galway

2 separate notices · latest notified commencement 19 Dec 2025 · planning reference supplied

Source notices
2
Latest notified commencement
19 Dec 2025
Latest notice
1 home
Planning references supplied
25/60389
Public location
Maigh Cuilinn, Galway

Public source geography

Site location

Public site / locality
Maigh Cuilinn, Galway
County
Galway

Public site labels seen across the notices

  • Cluain Duibh, Maigh Cuilinn
  • Cluain Duibh
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference25/60389

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0136674GC BCMS owner-supplied export

Construction of a new dwelling house witl all associated works at Cluain Duibh, Maigh Cuilinn.

1 home · 151 m² · stated on this notice

Planning reference 25/60389
CN0136673GC BCMS owner-supplied export

Construction of a domestic garage/garden shed at Cluain Duibh.

48 m² · stated on this notice

Planning reference 25/60389

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.