Commencement notice group

Building extension commencement notices — Kildimo New

Kildimo New, Limerick

1 separate notice · latest notified commencement 30 Aug 2023 · planning reference supplied

Source notices
1
Latest notified commencement
30 Aug 2023
Latest notice
1 unit
Planning references supplied
11/437
Public location
Kildimo New, Limerick

Public source geography

Site location

Public site / locality
Kildimo New, Limerick
County
Limerick
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference11/437

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0104618LL BCMS owner-supplied export

The scope of works required are: • New insulated limecrete ground floor slab. • New glass to Timber sash windows as specified. • New timber doors as specified. • Fire rated ceiling • Lean to extension with cavity wall and metal sheeted roof.

1 unit · 88 m² · stated on this notice

Planning reference 11/437 Builder stated: MP Joyce Contracting Ltd Developer stated: the Irish Landmark Trust Clg

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.