Site start

Building extension site start — Shannon

Shannon, Clare

1 commencement notice · start date 26 Jul 2021 · planning reference given

Planning 21/274 · Council file · external

View full project timeline

Commencement notices
1
Latest start date
26 Jul 2021
Latest notice
29 m²
Planning reference
21/274
Location
Shannon, Clare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Clare County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-07 2 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Shannon, Clare
County
Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Clare County Council planning record Application details, status and decision record for 21/274. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of works to include, reconfiguration of the existing south west elevation to provide an external canopy, signage on the building, roof level plant enclosure, a new pedestrian door to northwest elevation and a single storey switchroom & substation to rear of building in the yard space with all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 29 m².

Planning reference 21/274 Developer stated: Future Mobility Campus Ireland Company Ltd By Guarantee

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.