Site start
Erection of a 1MW Wind Turbine with hub height of 75 metres
Kepak Ltd. Condonstown, Watergrasshill, Cork
1 commencement notice · start date 07 Jan 2019 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 07 Jan 2019
- Latest notice
- Scale not stated
- Planning references
- None given
- Location
- R614, Kepak Ltd. Condonstown, Watergrasshill, Cork
Location
Where the site is
- Area
- Kepak Ltd. Condonstown, Watergrasshill, Cork
- County
- Cork
Addresses on the notices
- R614, Kepak Ltd. Condonstown, Watergrasshill, Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Erection of a 1MW Wind Turbine with hub height of 75 metres and a blade diameter of 66 metre, a new access roadway connecting to existing private roadway with underground ducting connecting to existing ESB substation and all associated site works. The application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. PO595-02.) Phase 1; Ground works Construction of 4m wide blinded hardcore access road and turning area. New track alignment to be realigned to overlay current hedge row location. Contractor to allow for excavation and removal of hedgerow material and 300mm deep strip of top soil and stockpiling of material within Blue outlined area in Figure 2. Track to consisting of 75mm Clause 804 on 225mm of 100mm crushed stone all rolled and compacted on terram geotextile (1 layer of thermally bonded non woven geotextile) with 300mm deep strip of soil removed from the length of the track. Please note additional 100m length of track required to be to be widened, strengthed and blinded to same standard as new track. 2 No. temporary access gates installed to secure site boundary. New post and mesh fence installed to enclose site area as per Site Layout Plans as well as enclosing additional 100m of track. 900mm piped culvert to be installed where track crosses drainage channel, contractor to include for the control of surface water.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.