Site start
Mullen Park — site start
Maynooth, Kildare
4 commencement notices · latest start date 14 Aug 2026 · planning reference given
Planning 2561496 · Planning application · Council file · external
- Commencement notices
- 4
- Latest start date
- 14 Aug 2026
- Latest notice
- 16 houses
- Planning reference
- 2561496
- Location
- Maynooth, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2561496 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Maynooth, Kildare
- County
- Kildare
Addresses on the notices
- Mullen Park, Maynooth, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 2561496. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 16 No. 2 storey dwelling houses at Mullen Park, Maynooth, Co. Kildare. This development consists of 1 No. 2-storey 4-bedroom house and 15 No. 2-storey 3-bedroom houses.
Floor area stated for this source: 1,680 m².
Construction of Duplex Block C, dwellings Nos. 22-25 at Mullen Park, Maynooth, Co. Kildare. This development consists of 2 No. duplexes in a single 3-storey block comprising of 2 No. 1 bedroom, single storey apartments at ground floor, and 2 No. 2 bedroom, two storey apartments at first floor.
Floor area stated for this source: 282 m².
Construction of Duplex Block B, dwellings Nos. 11-20 at Mullen Park, Maynooth, Co. Kildare. This development consists of 10 No. duplex apartments in a single 3-storey block comprising of 5 No. 1 bedroom, single storey apartments at ground floor, and 5 No. 2 bedroom, two storey apartments at first floor.
Floor area stated for this source: 707 m².
Construction of Duplex Block A, dwellings Nos. 1 - 10 at Mullen Park, Maynooth, Co. Kildare. This development consists of 10 No. duplex apartments in a single 3-storey block comprising 5 No. 1 bedroom, single storey apartments at ground floor, and 5 No. 2 bedroom, two-storey apartments at first floor.
Floor area stated for this source: 707 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.